Posts

TEN2-assembly

In Dalian / China, hard work is underway on the TEN2. Due to large orders for the other DC types, the development of the building moulds was halted for some time, but now all moulds for the interior parts are ready and the first interior parts have also been produced. Hull, bulkheads and interior parts are assembled and now the technical part begins, such as the electrics, engine installation, fuel tank, and the water ballast system. Because China is still closed due to Covid, we also have to check the building process with only the photos, but these photos look promising.

  

Big order for Chinese boatyard

In Dalian (China), the Dalian Changmei Pleasure Boat company is building 50 DC29’s and several TEN2’s for a Hong Kong customer. The first 10 boats must be delivered before 2022. We designed the DC29 (design number 177) in 2019 in a touring and racing version. The TEN2 (design number 182) is a new design, where the molds are currently being finalized. The yard from Dalian already built the last 12 years several of our designs, such as the TEN, the DC22, the DC12, the DC15 and the DC20.

Portfolio Items